根据早上的通知,按照我们厂现在的生产进度,加上材料未到位,23号的装柜计划恐怕不能按照计划进行。以下是我厂的问题所在:1.布料未到位,影响到裁剪车位扪皮的进度。
2.法律标签和吊牌未到位,要21号才能完成。由于此次的法律标签供应商购买材料难,交货期很赶。
3.最近天气很潮湿,时而下雨,现在部分木架湿度不过关,我们正在处理。如果按照现在的湿度出货,QC验货不通过会造成更大的损失。
就以上问题我们希望贵司跟客户申请延期,在原来基础上延迟一个星期出货,以便我厂更好的准备生产出货。
[ 本帖最后由 Frank.Brown 于 2010-5-22 16:54 编辑 ]
评论
根据早上的通知,按照我们厂现在的生产进度,加上材料未到位,23号的装柜计划恐怕不能按照计划进行。以下是我厂的问题所在:
According to our Production schedual and as we haven't collected enough the raw materials, i am afraid we can not load the cargo on 23rd as we planed before.
就以上问题我们希望贵司跟客户申请延期,在原来基础上延迟一个星期出货,以便我厂更好的准备生产出货。
We hope you can confer this with customers, and allow to delay delivery time to another week. Thanks for your cooperation.
评论
QUOTE:mayyymarry8296 向您报告以下的帖子,详细内容请访问:
他/她的报告理由是: According to the notification in the morning, our plant production progress now, plus material is not in place, 23, of loading plan am afraid I cannot follow the plan. Following is a question of where the problem is:
1. the material is not in place, the impact to the cutting of the progress of parking spaces for del Pi.
2. legal labels and tags are not in place, to 21 letter to complete. Since this law label vendor material difficult to drive, delivery is.
3. the recent weather is humid and rainy, now part of the wood moisture is, we are working on. If you follow the humidity out now, QC inspection performed not by bigger losses.
In respect of the above questions we would like to apply for an extension of your company with the customers, in the same delay a week out, so that my works to better prepare production shipments.
评论
什么意思、不明白、、、
评论
根据早上的通知,按照我们厂现在的生产进度,加上材料未到位,23号的装柜计划恐怕不能按照计划进行。以下是我厂的问题所在:
1.布料未到位,影响到裁剪车位扪皮的进度。
2.法律标签和吊牌未到位,要21号才能完成。由于此次的法律标签供应商购买材料难,交货期很赶。
3.最近天气很潮湿,时而下雨,现在部分木架湿度不过关,我们正在处理。如果按照现在的湿度出货,QC验货不通过会造成更大的损失。
就以上问题我们希望贵司跟客户申请延期,在原来基础上延迟一个星期出货,以便我厂更好的准备生产出货。
As your notice morning,no.23 of container can not load in on time ,because our present processing not enough and lack of material. our question as fllowing is:
1.lack of fabric,to impact to the cutting process.
2.there are no legal table until 21th.it is so difficult to purchase that the legal lable can't be deliverid by vendor on time.
3.as weather is wet and rain these day.a part of wood shelf are moist.we are working out.it is not only QC inspection will be failure and also more loss will be caused
according to the above question,we just holp you can apply with your customers for delay a week, it is better to prepare production for our shippment.