三. 付款方式1. 甲乙双方签订协议意向后乙方付定金 USD70,000给甲方
2. 甲方将主要设备拆卸,修整,油漆,在15-JUN-2013前乙方支付二期货款美金
USD210,000.00
3. 货柜装柜前,乙方支付USD200,000.00,甲方即装箱出货。
4. 机械设备到越南安装调试验收后,乙方在15日内付清USD46,580.00尾款
各方责任
1. 甲方收到第一期定金后,开始拆卸设备,并承诺在50天内完成主要的设备的维护,油漆等工作
2. 甲方收到定金10天内将提供主要设备的安装基础图
3. 甲方派工程人员指导乙方安装设备,工程人员在越南当地的饮食,住宿费用由乙方承担。
4. 设备到达乙方目的地后,甲方指导乙方安装调试机械设备。有关安装按照技术导致所产生的管路,电路等一切费用由乙方承担,
5. 甲方在设备装柜时前通知乙方派人验收,乙方付第三期货款
6. 办理机台设备调试完成后,所发生是一切事项均由乙方自负与甲方无关
评论
怎么都只有围观的,都没有帮忙的呢?太伤心了
评论
我也给你顶个!!!
评论
越南中文可以的,不过通常是有英文翻译中文,现在很少有中文翻译英文的,福友的高手们都在思考....
评论
三. Payment Terms
1. Party B pay the deposit USD 70, 000 to party A after the signature of the agreement by both parties.
2. After the deposit, party A should disassemble, repair and paint the main equipments. Party B should pay USD 210, 000 to party A before 15-JUN-2013.
3. Party A shall pay party B USD 200, 000 before the shipment.
4. Final payment, USD46, 580, should be paid within 15 days since the machinery was installed, debuged, checked and accepted in Vietnam.
四. Attribution of Liability
1. After the deposit, party A should disassemble, repair and paint the main equipments within 50 days.
2. After the deposit, party A should provide foundation drawings for main equipment installation within 10 days.
3. Party A send engineers to Vietnam to guide party B to install the equipment. The diet and lodging costs of the engineers in Vietnam were borne by party B.
4. Party A guide party B to install the equipment after the equipment arrived at the destination. During the installation process, all costs that produced by the technology shall be borne by party B, including the line cost, circui cost and so on.
5. Party A shall inform party B to examine the equipment before loading, party B should pay the third paragraph futures after the acceptance.
6. Party A responsiblity is termination after the equipment debugging completed.
评论
英语挺厉害!赞。。。。。。
评论
请注意三、3条,A与B位置 4条应该有by party B
评论
是的 thanks
评论
我觉得这个越南客户很难接受这样的吧 好像很苛刻
评论
太给力了,谢谢!
评论
太给力了,谢谢!
评论
不客气
评论
Terms of Payment
1.After the signed of the contract both Party A and Party B,Party B should pay USD 70.000 deposit to Party A.
2.Party A dismantle,repair and paint the main equipment ,then Party B should pay USD210,000.00 which the second phase of payment before 15-JUN-2013.
3.Upon Party B pay for USD210,000.00, Party A should effect the shipment .
4.After the mechanical equipment been installed and debugged after acceptance in Vietnam,Party B should pay the balance of USD46,580.00 within 15 days.
评论
加强英语口语的练习,对英语口语和提高英语能力有很好的帮助。有空加英语口语练习群253871084,一起跟老外真人一对一练习。我在那儿受益匪浅啊
加拿大电商昨天我把提单复件发给了客户,今天收到了他回信,如下: Dear Nicholas, please send all shipping documents. We will check B/L copy and we will reply ASAP. Thank you Best Regards ......................................... 加拿大电商刚从事这行半年,对电子行业不了解,自己整理了些,算是学习,供大家分享,也请大家补充。我毕竟是个文科生,对这方面知识严重欠缺。 DVD:英文全名是Digital Video Disk, 即数字视频光
·中文新闻 香蕉康达!当英国背包客在澳大利亚工厂里看到一堆香蕉时,他
·中文新闻 联合国气候变化谈判:提议加密货币和商务舱飞行税